Black Mesa Mod

  • Home
  • Community
  • Media
  • Team
  • About
  • Wiki

Residue Processing

From Black Mesa: Wiki

Jump to: navigation, search
Categories: Chapters | Stub

Contents

  • 1 Chapter Summary
  • 2 Gameplay
  • 3 Redesign History

Chapter Summary

After escaping from the trash compactor, Gordon enters the waste disposal facility where all of Black Mesa's waste is processed. Before returning to the surface, Gordon must navigate through this gauntlet of hazardous machines and deathtraps, as well as fight through hordes of Xen aliens, all without the aid of his previously robust arsenal.

Residue Processing is the tenth chapter of Black Mesa.

Gameplay

This chapter slowly reintroduces Gordon's weapons, and slows the pace of the game after being captured and thrown in the trash compactor. There is a noticeable platforming element in this chapter, manifest in conveyor belts, compactors, mixers, incinerators, and various other dangerous machines that the player must navigate in order to progress.

Redesign History

The early iteration of the map, made mostly by Abe Robertson, was deleted and rebuilt by Jean-Paul Jarreau with a totally different point of view.

According to Jean Paul, Abe had "a clean, lab-like approach to the heaviest and grittiest chapter in the entire game. He [had] small, warehouse like elements where once giant and epic industrial structures once stood. But most importantly, he [ignored] a large gameplay elements in both c2a4b and c2a4c, leaving it bland, boring, and rather confusing in some parts."

So, in the new design, Jean Paul opted for an intimidating feel, increasing the vertical space but keeping the same or half of the horizontal space from the original. Also, he increased the emphasis on exploration, "with loads of optional back tracking elements, hidden stashes, and a shit ton of extra little bits to look around and enjoy". [4]


Redesign Gallery
Below, screenshots of Abe's iteration.

Entrance to the waste disposal facility. Initial version.

Ditto. A slightly different version of this area, as it appears in the picture, is featured in the Official Teaser.

Entrance to the waste disposal facility.

Entrance to the waste disposal facility, with more detail applied.

Very early layout of the first waste tank puzzle.

One of the early conveyor belt rooms.

Ditto. Improved with more details.

The "shit river". Planned to be even more "shittier" in Jean Paul's iteration. [1]

Composting towers, props made by Frank Morel for the chapter [2]. Some of the conveyor belts lead to the bladed grinders inside them [3].



Single-Player
Show ▼
FAQ  •  Ammo  •  Chapters  •  Characters  •  Enemies  •  Environment  •  Features
Fiction  •  Items  •  Music & Sound  •  Vehicles  •  Voice Acting  •  Weapons
 
Chapters
Show ▼
Hazard Course  •  Inbound  •  Anomalous Materials  •  Unforeseen Consequences  •  Office Complex We've Got Hostiles  •  Blast Pit  •  Power Up  •  On a Rail  •  Apprehension  •  Residue Processing
Questionable Ethics  •  Surface Tension  •  Forget About Freeman  •  Lambda Core  •  Xen  •  Gonarch's Lair
Interloper  •  Nihilanth (Chapter)  •  End Game
 


This article is a stub. You can help the Black Mesa Wiki by expanding it.
Retrieved from "http://wiki.blackmesasource.com/Residue_Processing"
Personal tools
  • Log in / create account
Navigation
  • Main Page
  • Community portal
  • Current events
  • Recent changes
  • Random page
  • Help
SEARCH
TOOLBOX
LANGUAGES
Views
  • Page
  • Discussion
  • View source
  • History
 
Toolbox
  • What links here
  • Related changes
  • Special pages
  • Printable version
  • Permanent link
Powered by MediaWiki
  • Privacy policy
  • About Black Mesa: Wiki
  • Disclaimers